A falsework design calculated to CIRIA Report 108 assumes a concrete that behaves roughly like the concretes measured when the report was written: a given rate of rise, a given temperature, a given point at which the mix stops acting as a fluid and starts carrying its own weight. Low carbon, self-consolidating and rheotropic mixes do not reliably follow that pattern, and in June 2026 the Temporary Works Forum used a full session of its quarterly meeting to ask whether the method still holds for them.
That is not a settled technical question with a published answer. It is a live, unresolved concern being raised by practitioners right now, which makes it a question for anyone specifying falsework for a modern mix today rather than something to wait out.
Why This Question Is on the Agenda Now
At the Temporary Works Forum's 66th quarterly meeting, held at the Institution of Civil Engineers in June 2026, Aaron Lucid of Vemaventuri GmbH, a PERI partner company, presented specifically on
the Impact of Modern Concretes on CIRIA Report 108 Rate-of-Rise Assumptions
. The session included
a brief review of CIRIA Report 108 assumptions on rate of rise, temperature and concrete grouping, and how these relate to today's mix designs
, as set out in the event programme.
The stated aim of the session was
to prompt a discussion within the Temporary Works forum on whether current use of CIRIA Report 108 remains conservative for modern and ultra-low carbon concretes, and how monitoring data should inform future guidance
. In other words, the body most closely involved in UK temporary works practice has put the question on the table without yet answering it. That gap between an open technical question and a falsework design due to be signed off is exactly where risk sits.
What CIRIA Report 108 Actually Assumes
CIRIA Report 108
provides guidance on calculating concrete pressures on formwork, extending and improving the method used in CIRIA Report 1 to cover concretes using admixtures and blends or blended cements
, as described on CIRIA's own page for the report. Before it was published,
design charts were limited to plain ordinary Portland cement concretes, but in recent years greater use has been made of admixtures and blends or blended cements, and the commercial need for faster construction has resulted in a general increase in lift heights and rates of concrete placing
.
The method itself was built empirically.
CIRIA instigated a programme of site formwork pressure measurements and compiled a comprehensive data file to contain both the new site measurements and previously obtained data, which was used, alongside recent advances in the understanding of the mechanisms, to formulate an improved method of estimating the concrete pressure on formwork
. That is the strength of the method and also its limit: it is calibrated to the concretes and practices that were being measured at the time. A mix that behaves materially differently from that population is being extrapolated beyond the data the charts were drawn from, not interpolated within it.
How Low Carbon and Self-Consolidating Mixes Change the Pressure Profile
The behaviour the Temporary Works Forum session focused on is specific. Modern ultra low carbon and low heat concretes were described as having
slower hydration, altered temperature profiles and extended fluid behaviour
that are
challenging traditional pressure envelopes
, according to the session description. Self-compacting and rheotropic mixes bring a related but distinct set of behaviours:
thixotropy, prolonged hydrostatic conditions and non-linear solidification rates versus temperature
.
The practical read across for a temporary works designer is that two of the inputs CIRIA Report 108 treats as reasonably predictable, the point at which the concrete starts to gain enough strength to stop acting as a fluid, and the temperature profile that drives that strength gain, can shift with these mixes. If the concrete stays hydrostatic for longer than the calculation assumed, the design pressure at a given height in the form can be higher than the chart predicts, even where the rate of rise on the pour programme has not changed at all.
Where Site Practice Already Pushes Pressure Beyond the Model
Mix behaviour is only one side of it. The same Temporary Works Forum session set out site practices that
drive pressures beyond model expectations
, specifically:
- Over-compaction or re-energizing lower lifts
- Pumping at high pressures and bottom-up placing
- Irregular pour rates and delays between lifts
None of these is unusual on a live pour. They are the kind of day-to-day adjustments a pour team makes to keep a programme moving, and each one is also a way of adding energy or extending fluid behaviour in the lower part of a pour that a rate of rise calculation treated as already stable. Combine one of these practices with a slower hydrating mix and the two effects do not simply add, they compound in the direction that matters least conveniently, towards higher pressure for longer.
What a Temporary Works Coordinator Should Check Before Specifying Falsework
A falsework design is still a design under the general duty HSE sets out for temporary structures:
any temporary structure must be designed, installed and maintained to withstand any foreseeable loads which may be imposed on it and that it be only used for the purposes for which it was designed, installed and maintained
, as HSE's temporary works guidance puts it.
Falsework for above ground concrete pours
is listed explicitly among the temporary works that provide structural support in that same guidance.
Before specifying falsework for a low carbon, self-consolidating or rheotropic mix, that puts a short list of questions in front of the coordinator:
- What is the actual mix design, including the binder blend, and has the supplier's data on setting time and heat development been obtained rather than assumed from a generic low carbon label.
- What rate of rise and placing method does the pour programme assume, and does it match what the falsework calculation was based on.
- Does the pour sequence rely on practices known to add pressure, such as bottom-up pumping or lift re-energizing, and if so has that been reflected in the design pressure rather than left as a site variable.
- Is the fluid pressure assumption for the lower lifts hydrostatic for a longer height than a conventional mix would require, given the mix's measured setting behaviour.
This sits alongside the general point we have made before about what temporary works design actually involves: it is not a generic calculation lifted from a chart, it is a design for the specific sequence, loads and materials on that pour.
Monitoring: Why Embedded Sensors Are Becoming Part of the Answer
The forum session also covered
real-time use of embedded sensors to monitor formwork pressure, validate or contradict model predictions and capture construction-stage behaviour
. That is a notable shift in emphasis. Where a calculated pressure envelope is being relied on for a mix the method was not built around, monitoring data from the actual pour is the only way to know whether the calculation is still conservative or whether it has been quietly overtaken on site.
For a temporary works coordinator this means treating the falsework design and the pour monitoring plan as one package rather than two separate documents. A calculation that cannot be checked against what actually happened during the pour gives no warning if the assumptions turn out to be wrong, and the first sign of a problem on unmonitored falsework is rarely a convenient one.
When an Independent Design Check Should Be Non-Negotiable
HSE's general position on temporary works design is that
in all bar the simplest situations a design, including calculations, will be needed for the temporary works, and in more complex works the design will also need to be checked by an independent party
. A falsework design for a mix whose behaviour sits outside the population CIRIA Report 108 was calibrated against is a reasonable case for treating that independent check as essential rather than discretionary, precisely because the open question the Temporary Works Forum raised in June 2026 has not yet been closed by revised guidance.
HSE also points to the Temporary Works Coordinator as the person responsible for making sure
suitable designs are prepared, checked and correctly erected on site
, noting that
on a complex project this person is often a chartered civil or structural engineer with relevant experience and training and based on site
. We have written separately about what independent design checks for temporary works involve and when they add real value rather than being a box ticked after the fact, and the reasoning applies directly here: a check is most useful before the pour, not after a problem has already shown up in the formwork.
If you are specifying falsework for a low carbon, self-consolidating or rheotropic mix and want the pour rate, mix data and monitoring plan looked at independently before the pour, our temporary works design service covers exactly this. Get in touch through our contact page or call us on 07715 541143 to talk through the pour before the calculations are signed off.