Q-00 FAQ

Straight answers from a chartered engineer.

01 Questions

Pick a topic

Temporary Works

What is temporary works design?

Temporary works design is the engineering of structures used during construction that are not part of the permanent finished building. Examples include propping, shoring, falsework, formwork, excavation support and scaffolding. All temporary works must be designed by a competent engineer and managed in accordance with BS 5975.

What is a temporary works coordinator?

A temporary works coordinator is the person appointed on a construction project to manage the temporary works process from design through to removal. They are responsible for ensuring designs are produced, checked, approved and implemented safely in accordance with BS 5975.

What is BS 5975 and why does it matter?

BS 5975 is the British Standard Code of Practice for Temporary Works Procedures and the Permissible Stress Design of Falsework. It sets out the responsibilities, processes and technical requirements for managing temporary works on construction projects in the UK. Compliance is expected by principal contractors, clients and the Health and Safety Executive.

What is the difference between falsework and formwork?

Formwork is the mould into which concrete is poured to achieve the desired shape. Falsework is the temporary structure that supports the formwork and the wet concrete until it has gained sufficient strength to be self-supporting. Both must be structurally designed and managed carefully.

When do you need a propping design?

A propping design is needed whenever temporary props are used to support an existing structure during construction. This includes situations where load bearing walls or floors are being altered, removed or replaced, and where adjacent structures need to be supported during excavation or demolition.

What is a method statement in construction?

A method statement is a document that describes in detail how a specific construction operation will be carried out safely. For temporary works and structural alterations, a method statement is typically required by the principal contractor and building control as part of the approval process.

Who is responsible for temporary works on a construction site?

Under BS 5975 the principal contractor has overall responsibility for temporary works on site. They must appoint a temporary works coordinator and ensure that all temporary works are designed, checked, approved and implemented safely. The temporary works designer is responsible for producing safe and compliant designs.

Do temporary works need to be designed by a structural engineer?

Yes. All temporary works must be designed by a competent person with the appropriate engineering knowledge and experience. For anything beyond the most straightforward situations this means a qualified structural engineer. The design must also be independently checked before implementation.

What is shoring and when is it used?

Shoring is a temporary support system used to stabilise existing structures during construction. It is used when carrying out structural alterations to existing buildings, during demolition works, and to support adjacent structures during excavation. Shoring must be structurally designed and managed in accordance with BS 5975.

What is excavation support and when is it needed?

Excavation support is a temporary works system used to prevent the collapse of the sides of an excavation. It is needed for deep excavations, excavations in poor ground conditions, excavations adjacent to existing structures, and basement construction. Common methods include trench boxes, sheet piling and contiguous piled walls.